Sydney Science Park, Luddenham, NSW

Geothermal Industries was selected to drill a Thermal Conductivity Test well to 100m on the site of the future development. The test well drilling was completed in one day with all subsurface geology accurately logged and samples captured. Geothermal Industries finished the test drilling by installing a Muovitech Turbo ground heat exchanger and grouting the borehole from the bottom up to surface.

< Back to all projects